Saudi Arabia
Taif

Taif independent Wastewater Treatment Plant Project

Year
  • 2022
Country
Saudi Arabia
City
Taif
Status
  • Realised
Capabilities
  • Cobra-Tawzea consortium
Sustainable development goals
Clean Water and Sanitation Sustainable Cities and Communities

Design of a wastewater treatment plant near the city of Taif with a treatment capacity of 367,000 population equivalent 

The SBR (Sequencing Batch Reactor) treatment plant has been designed with a capacity of 100,000 m³/day, expandable to 270,000 m³/day,

The entire project will be carried out in BIM, from the design phase to the operation and maintenance phase.    

Our mission(s)

Detailed design