Tunisia
Sidi Bouzid
Sidi Bouzid Wastewater Treatment Plant
Construction of a new wastewater treatment plant with a nominal capacity of 56,667 PE (population equivalent)
The project involves:
- the construction of the wastewater treatment plant itself (extended areation system – flow rate: 7,300 m³/d - load: 3,400 kg BOD5/d),
- 13,500 m of sewers for conveying wastewater to the plant,
- 2,000 m of outfall pipe,
- the construction of two pumping stations capable of handling a flow of 750 m³/h.
Our mission(s)
- Technical assistance
- Works control