High Speed Railway Line Ankara - Istanbul
Construction of an electrified double-track line
The project is financed by the EIB according to the technical specifications for interoperability of the trans-European high-speed rail system.
The line equipped with European Rail Traffic Management System (ERTMS) extends 490 km in length and includes:
- 15 stations,
- 41 km of tunnels,
- 15 km of viaducts.
It allows trains to travel at a speed of 250 km/h and save three and a half hours on the old route.
Our mission(s)
- Assistance to the General Directorate of Turkish State Railways (TCDD) in the coordination, supervision and integration of contracts related to the project
- The tasks include the design, construction and construction management of tracks, structures, signalling and communication systems, electrical systems and maintenance equipment